Boxi and Gaoshaling Oil & Gas Treatment Plant Pipeline Recovery Project (Year 2018)
offshore cable installation
Project Introduction:
Abandoned 8” mixed transportation pipeline and 12” natural gas submarine/offshore pipeline of Boxi treatment plant, dismantled and recycled 600m section through the tunnel section of Gaoshaling port area, both ends on site sealing, pipeline ends sealing treatment;
About offshore cable installation for Indonesia
Abandoned 8” mixed transportation pipeline and 12” natural gas submarine/offshore pipeline of Boxi treatment plant, dismantled and recycled 150m section through the breakwater, both ends on site sealing, pipeline ends sealing treatment.
Ma Mu & Yu Shan Islands Submarine/Offshore Pipelines Installation Project (Year 2018)
China offshore cable installation
underwater cable installation
Project Introduction: Horizontal pipe lifting; Inclined riser integrally lifting and overall lower down work after tie-in; Two crude oil submarine/offshore pipelines, One natural gas pipeline landing point 150m long trench flushing work.
Weizhou 12-2 Oilfield Phase Development Project (Year 2016)
offshore pipe installation
China offshore pipe installation
Project Introduction and Work Scope:
Hydrotesting and spool installation for submarine/offshore pipeline and cable connection debugging service. 4 sections, 45m pipeline cutting operation, pipeline ends polishing; blind plate, anchorage parts and flanges welding; 3 straight sections prefabrication, each straight pipe and flange welding.
Tanzania Mnazi Bay Submarine/Offshore Pipeline Laying Project (Year 2014)
underwater pipe installation
offshore pipe installation for Philippines
Project Introduction: Part of gas pipeline crossing Mnazi Bay, shallow water area is , total length is 16km.
Work Scope: Pipeline laying (float laying method), pre/post-trenching, pipeline pulling and landing.
Philippines 20MW [Net] Steam Turbine Genset Project (Year 2017-2018)
underwater pipe installation company
offshore pipeline installation
Project Introduction: 20MW [Net] Steam Turbine Genset Project is located in Lafarge cement plant in Iligan, North Mindanao, Philippines. The construction companies of this project is a joint venture established by PowerSource and lligan cement plant in Lafarge, Philippines. The general contractor is China Energy Engineering Group Jiangsu Power Design Institute Co., Ltd.
Work Scope of China offshore pipeline installation: The intake pipeline is about 115m, the drainage pipeline is about 97m. Steel pipe and steel structure are Q235B, offshore/subsea pipeline specification Ø1020mm . The length of the dosing pipeline is 120m, the specification is DN100mm, the material is HDPE.
Huludao Island & Juehuadao Island Water Supply Pipeline Project (Year )
offshore pipeline installation for Tanzania
submarine pipe installation
Project Introduction: This project is water supplying from land to offshore island. Pipeline total length: 7km, diameter: DN200mm, material: HDPE, the subsea pipeline laying method is float-pulling due to the shallow water condition.
Hebei Province CFD Chemical Industrial Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2017)
submarine pipe installation for Vietnam
China submarine pipe installation
Project Introduction: Onshore pipeline , offshore pipeline .
Work Scope: Pipeline procurement, anticorrosion, subsea pipeline and pile installation, pre-trenching, backfilling, hydrotesting.
Liaobin Development Area Submarine/Offshore Pollution Drainage Pipeline Laying Project (Year 2016)
submarine cable installation for Bangladesh
offshore cable installation company
Project Introduction: The designed drainage quantity is 50,000 m3/d, subsea pipeline total length (DN1000), wall thickness: .
Work Scope: Pipeline laying, landing, onshore valve well and pile installation, post-trenching and backfilling.
Huludao Submarine/Offshore Optical Cable Laying (Year 2017)
underwater pipe installation construction
offshore cable repairing service Provider
Project Introduction: Approximate 13km submarine/offshore cable laying (including landing installation at both ends) , submarine/offshore cable connection at both ends, submarine/offshore cable inspection, hydrotesting work etc. High pressure hydraulic jet embedding machine (traction type) is adopted to carry out laying and burying at the same time. Bury depth is no less than 3 meters. By modification of equipment, Timeast met the construction quality requirements at one time and successfully completed the construction task, and achieved another breakthrough in technology.
Tincy Energy Group Yuedong Oil Field Submarine/Offshore Cable Repairing (Year 2014)
offshore pipeline construction
offshore pipeline construction for Thailand
Project Introduction: Yuedong Oil Field, A and B cable between island and onshore broke, need to be repaired emergently.
Work Scope: Subsea cable searching, fault point searching and checking, cable salvage, fault point repairing and pressure testing.
Sinochem Quanzhou PetroChemical Submarine/Offshore Cable Laying (Year 2013)
offshore pipeline construction companies
submarine cable installation service
Project Introduction: 2 subsea pipelines total length 13km, 35kv.
Tianjin Timeast Offshore Engineering Co., Ltd. was registered in Tianjin TEDA in January 2002 (former name is Tianjin TEDA Timeast Offshore Equipment Co., Ltd. Timeast for short hereinafter). There are 75 employees, including 54 technicians, 3 senior engineers, 5 constructors, 8 associate constructors. Timeast owns 601 pipeline laying barge and SE-12000 pre/post trenching excavator etc. nearly 40 sets of large scale and professional engineering equipments.
Timeast focuses on submarine/offshore engineering business from the foundation, through years of efforts, our footprint spread all over the sea areas in China and also in Africa and Asia such as Indonesia, Philippines, Vietnam, Bangladesh, Thailand, Malaysia, Kenya and Tanzania etc. If you are interested in our service, please feel free to contact us.
Roc Oil Zhaodong Oil Field Cable Repairing (Year 2012)
submarine cable installation service for Malaysia
underwater cable installation service
Project Introduction: Subsea cable of P4-CEP and P3-CEP broke need to be repaired emergently.
Work Scope: Subsea cable searching, fault point searching and checking, cable salvage, fault point repairing and pressure testing.
CNOOC BN Submarine/Offshore Pipeline Landing Project (Year 2005)
submarine pipe installation service
submarine pipe installation service for Kenya
Project Introduction: BN 26-2 submarine/offshore pipeline landing project is part of CNOOC BN oil field development project.
Work Scope: Site preparation, construct, life support, pipeline onshore pre-trenching and backfilling, nearshore pipeline pre-trenching and backfilling, pipeline pulling and site reinstatement, local authority relationships coordination.
CNOOC Indonesia SES Gas Submarine/Offshore Pipeline Landing Project (Year 2005)
offshore cable repairing
offshore pipe repairing service Provider
Project Introduction: CNOOC Indonesia SES gas submarine/offshore pipeline landing project.
Work Scope: Construction site temporary building, pre-trenching, pipeline pulling and landing, backfilling, local authority relationship coordination.
CNOOC Panyu Submarine/Offshore Pipeline Landing Project (Year 2004)
submarine pipeline installation
China submarine pipeline installation
Project Introduction: Panyu submarine/offshore pipeline landing project is part of submarine pipeline of CNOOC Panyu oil field oil & gas development project.
Work Scope: Landing approach pre-trenching, pipeline pulling and landing, backfilling, site service, local authority relationships coordination.
CNOOC LD Submarine/Offshore Pipeline Laying Project (Year 2004)
offshore pipe repairing
offshore pipeline repairing company
Project Introduction: LD submarine/offshore pipeline laying project is part of CNOOC LD 5-2 oil field oil & gas development project.
Work Scope: Landing part reef blasting, pre-trenching, pipeline pulling and landing, backfilling, site service, local authority relationships coordination.
JZ9-3 Oil Field Platform Anti-Icing Design, Fabrication and Installation (Year 2009)
subsea pipeline installation
China subsea pipeline installation
Project Introduction: JZ9-3 oil field Jacket anti-icing destroyed seriously.
Work Scope of offshore pipeline repairing: Structure re-design, fabrication, site installation, cable protection pipe and pipe clip installation.
Floating Hose Inspection, Displace, Installation
offshore pipe laying installation
submarine pipe repairing
Timeast performed many CNOOC QHD32-6、CFD11-2 and JZ9-3 offshore oil field floating inspection and displacement project.
CFD11-2 Offshore/Subsea Oil Field Jumper Hose and Cable Check, Repair and Installation between SPM and FPSO (Year 2007-2008)
submarine cable repairing
submarine cable laying company
Project Introduction:
-Jumper Hose Parameter: ø 24”×55m
-Working Pressure: 139bar
-Jumper Cable Parameter: ø149mm×55m
Work Scope:
-Visual Inspection and Performance Testing
-Transportation and Load and Sea Fastening
-Offshore/Subsea Installation
Tincy Energy Group Yuedong Oil Filed, Bumper of Offshore/Subsea Production Platform A1,A2, Design, Fabrication and Site Installation
China offshore pipe laying
underwater pipe laying
Project Introduction: Jacket leg was seriously destroyed by ice fluent in winter, the new bumper breaks every year.
Work Scope: To solve the problem completely, Timeast re-design the structure, calculation and structure fabrication, offshore/subsea installation.